Task creation

This mode is designed to create tasks based on collection components. If the manufacturing process is connected to the item (you can do it in mode “Technology” and/or in mode “Capability”), it will be created as many tasks as there are operations in manufacturing process (components with reference “Operation”). Both the reference for manufacturing process and the references for the created tasks will be placed to the block “Collections” of that component they are created for. 

Always you can check the manufacturing process that was used for task creation, as well as a list of tasks.

The item that will be produced and the content of manufacturing operation will be put to the block of task collection.

Это изображение имеет пустой атрибут alt; его имя файла - 2018-11-21_11-14-05.png

Moreover, to the block “Files” will be put all references for the files, that are available both for nomenclature (drawings, models etc.) and for operation (control programs, operational drawings etc.).

Это изображение имеет пустой атрибут alt; его имя файла - 2018-11-21_11-38-48.png

Additionally, to the task are attached the references for previous and next task.

Это изображение имеет пустой атрибут alt; его имя файла - 2018-11-21_11-19-48.png

The execution results will be written to the same block (collections with connection “Execution”).

A status “Preparation” will be assigned to the newly created task.

If the manufacturing process is not connected, one task will be created with indication of producing items. Set of files will be created as well. 

 

 

Leave a Reply